|
|
TOWN OF AGAWAM PERMIT FEES
|
Type
|
Fee
|
|
Residential buildings
|
|
|
|
One- and two-family:
|
$400
|
|
|
|
Additions and alterations, access structure, swimming pool
|
$75
|
|
|
|
Access building under 100 square feet, aboveground swimming pool
|
$30
|
|
|
|
Aboveground swimming pool with deck
|
$50
|
|
|
Multifamily:
|
|
|
|
|
All floors, excluding cellar, per square foot
|
$0.30
|
|
|
|
|
Minimum:
|
$300
|
|
|
|
Additions, alterations and accessory buildings, per square foot
|
|
$0.25
|
|
|
|
|
Minimum:
|
$150
|
|
Business and industrial buildings
|
|
|
|
All floors, excluding cellar, per square foot
|
$0.40
|
|
|
|
Minimum:
|
$300
|
|
|
Additions, alterations and accessory buildings, per square foot
|
$0.30
|
|
|
|
Minimum:
|
|
$200
|
|
Farm buildings
|
$50
|
|
Electrical
|
|
|
|
Single-family (less service)
|
$100
|
|
|
Two-family
|
$175
|
|
|
Multifamily; hotel; motel (per unit)
|
$80
|
|
|
Residential addition or alteration
|
$60
|
|
|
Appliance; aboveground pools, repairs and alarms (existing house); any other electrical permits requiring one inspection
|
$30
|
|
|
Inground pools
|
$55
|
|
|
Alarms, low-voltage, data and communication
|
$55
|
|
|
Service:
|
|
|
|
|
Up to 200 amps
|
|
$30
|
|
|
|
Over 200 amps
|
|
$75
|
|
|
Business and industrial (determined at permit issuance), minimum:
|
$200
|
|
|
Business and industrial additions and alterations (determined at permit issuance), minimum:
|
$100
|
|
Plumbing
|
|
|
|
Single-family, new
|
$100
|
|
|
Two-family, new
|
$175
|
|
|
Multifamily; hotel; motel (per unit)
|
$80
|
|
|
Residential additions and alterations
|
$60
|
|
|
Business; industrial; commercial:
|
|
|
|
|
Permit (includes one fixture or appliance)
|
$200
|
|
|
|
Per additional fixture or appliance
|
$5
|
|
|
Business; industrial; commercial additions and alterations
|
|
|
|
|
Permit (includes one fixture or appliance)
|
$100
|
|
|
|
Per additional fixture or appliance
|
$5
|
|
|
Gas permit
|
$55
|
|
|
All other plumbing or gas permits requiring one inspection
|
$30
|
|
Miscellaneous
|
|
|
|
Woodstove, fireplace, roofing, siding, doors, windows, chimney, tents
|
$30
|
|
|
Signs, all sizes
|
$35
|
|
|
Demolition
|
$20 |
WHENEVER THERE IS ANY UNCERTAINTY AS TO THE CLASSIFICATION, FEE OR FINE OF A BUILDING PERMIT, THE BUILDING OFFICIAL SHALL DETERMINE THE CLASSIFICATION, FEE OR FINE WITHIN WHICH IT FALLS.
ELECTRICAL PERMITS SHOULD BE APPLIED FOR PRIOR TO THE START OF WORK BEING DONE, BUT NOT LATER THAN FIVE (5) DAYS AFTER WORK COMMENCES.IF THIS STATE REQUIREMENT IS NOT FOLLOWED, A FEE OF $50.00, IN ADDITION TO THE REGULAR FEES LISTED ABOVE, WILL BE CHARGED.
ALL BUILDING, PLUMBING AND GAS PERMITS MUST BE APPLIED FOR PRIOR TO THE START OF ANY WORK BEING DONE OR A FEE OF $50.00, IN ADDITION TO THE REGULAR FEES LISTED ABOVE, WILL BE CHARGED. |
|